Consents and compliance

Do I need building consent for a renovation?

Frequent Architecture Questions (FAQs)

Architecture comes with plenty of questions, from investment budgets and timelines to consenting, design decisions and what actually happens next. We have gathered the questions we are asked most often to give you clear, practical answers before your project begins.

Whether you are planning a new home, renovation, extension, holiday home or development, anywhere in New Zealand, this is a good place to start.

Architectural drawings with Building Act 2004 and New Zealand Building Code reference books, government logos and a consent documentation checklist.
★ ★ ★ ★ ★
Loading reviews...

Some renovation work is exempt, but structural changes and many alterations require building consent. Assess the actual work and all exemption conditions before starting; the size of the renovation or the name of the room does not decide the answer.

Define the work precisely

Describe what will change, including walls, structure, external openings, drainage, plumbing and the building envelope. Painting or replacing finishes is very different from opening a load-bearing wall. Even within one room, some tasks may be exempt while others require an approval or a specific professional.

Check the relevant exemption

Schedule 1 of the Building Act contains exemptions with conditions. For example, the internal-wall exemption excludes load-bearing walls, bracing elements, fire separations, certain specified-system walls and masonry walls. Do not decide whether a wall is structural from its appearance alone. Existing plans and professional assessment can help establish its role.

Consider the rest of the project

An exemption from building consent does not remove Building Code obligations or automatically resolve planning requirements. Separate work, such as changes to drainage or the exterior, needs its own assessment. Current plumbing and drainage pathways should be checked with the appropriately authorised professional rather than assuming that every bathroom project follows the same route.

Confirm the approach before demolition

Prepare a clear scope and identify which drawings, investigations and specialist advice are required. Keep records of exempt work as well as consented alterations. Modal’s renovation service can help establish a coordinated design and approval pathway. Check current MBIE guidance and council requirements for the specific proposal before work starts.